
Roads & highways
Bahr-el-Ghazal Highways Network
Earthworks and pavement layers across more than 50 kilometres of highway alignment, from roadbed preparation at KM 15+000 through top embankment fills beyond KM 52+750.

Juba · Kampala · Dubai — a Teqwah company
South Sudan headquartered with active contracts across East Africa. Over 20 years of heavy civil delivery — thousands of kilometres of road and hundreds of bridges — backed by an Eritrean, Emirati, Saudi, Sudanese and international ownership base, a 250-unit heavy fleet and a workforce built in South Sudan.
20+
Years across East Africa
1,000s km
Of road delivered
100s
Bridges & structures
248
Owned plant & fleet units
Capability
Eagle combines site delivery with its own plant and supply chain — so mobilisation does not wait on third parties.
Roadbed, embankment layers, subgrade, asphalt, box culverts and structures — delivered under one contract.
Excavators, dozers, graders, rollers, dump trucks and tankers stationed across Palouch, Rumbek and Juba.
75+ staff at Palouch oilfield and HQ, with on-the-job training that builds local capability.
A dedicated HSE department enforces safe working conditions and environmental compliance on every site.
Services
Asphalt and murram road construction from roadbed preparation and embankment layers through subgrade, base and surfacing.
ScopeReinforced concrete structures including multi-cell box culverts, bridge decks, headwalls and drainage works.
ScopeCommercial, residential and camp construction — including the Eagle Tower development in Juba — plus water supply projects.
ScopeWell pad construction, access roads and bulk earthworks for oil and gas operators in the Palouch and Adar fields.
ScopeRental and supply of heavy trucks, water and vacuum tankers, plant, spare parts and light vehicles with operators.
ScopeOily, solid and liquid waste treatment for oil and gas fields, plus supply and distribution of petrochemical products.
ScopeSelected work

Roads & highways
Earthworks and pavement layers across more than 50 kilometres of highway alignment, from roadbed preparation at KM 15+000 through top embankment fills beyond KM 52+750.

Bridges & structures
Cast-in-place three-cell box culverts and cross drainage structures, from bedding preparation and rebar fixing to top slab casting and backfill.

Oilfield services
Well pad construction, access roads, water supply and waste handling for oilfield operations, supported by a dedicated fleet and a 75-strong site workforce.

Browse the full fleet schedule by category and yard — 248 units across Palouch/Adar, Rumbek and Juba.
Safety first
Eagle's Health, Safety and Environment department plans, coordinates and enforces policy across every site — preventing accidents, injuries and property loss, and keeping working conditions safe for all employees.
