Dump trucks hauling fill material on an Eagle Construction site

Projects

Kilometres, layers and structures

Highway earthworks measured in kilometres, box culverts cast in place, oilfield pads and a commercial tower in central Juba.

Road pavement layer being placed on the Bahr-el-Ghazal highway alignment
Roads & highwaysDelivered

Bahr-el-Ghazal Highways Network

Bahr-el-Ghazal, South Sudan

Earthworks and pavement layers across more than 50 kilometres of highway alignment, from roadbed preparation at KM 15+000 through top embankment fills beyond KM 52+750.

  • Roadbed preparation KM 15+000 – KM 41+700
  • First, second and third embankment fill layers
  • Subgrade fill and top embankment fills
  • Field density testing across every compacted layer
Completed multi-cell reinforced concrete box culvert
Bridges & structuresDelivered

Box Culverts & Highway Drainage

Bahr-el-Ghazal corridor, South Sudan

Cast-in-place three-cell box culverts and cross drainage structures, from bedding preparation and rebar fixing to top slab casting and backfill.

  • Three-cell box culvert construction
  • Bedding preparation and FDT of bedding layers
  • Rebar fixing, formwork and top slab casting
  • Structural backfill and erosion protection
Eagle water tanker fleet operating at an oilfield site
Oilfield servicesOngoing

Palouch & Adar Oilfield Civil Works

Palouch / Adar oilfields, Upper Nile

Well pad construction, access roads, water supply and waste handling for oilfield operations, supported by a dedicated fleet and a 75-strong site workforce.

  • Well pad and access road earthworks
  • Water tanker and vacuum truck services
  • Oily and liquid waste handling
  • Plant, fuel and logistics support
Architectural view of the Eagle Tower development in Juba
BuildingsUnder construction

Eagle Tower, Juba

Near Alfa Bank, Juba

A mixed-use commercial tower developed and built by Eagle in central Juba — a design intervention proposal taken through to construction.

  • Substructure and reinforced concrete frame
  • Envelope and curtain wall installation
  • Building services coordination
  • Site logistics in a dense urban setting
Motor grader shaping a murram road formation near Rumbek
Roads & highwaysDelivered

Rumbek Roads & Regional Works

Rumbek, Lakes State

Regional road formation, gravelling and compaction supported by a dedicated Rumbek equipment yard of graders, rollers, loaders and haulage.

  • Formation grading and murram gravelling
  • Compaction and moisture conditioning
  • Culvert and drainage installation
  • Local recruitment and on-the-job training
Excavator loaded on a low-bed trailer for transport
Equipment & logisticsOngoing

Juba Plant Yard & Heavy Haulage

Juba, Central Equatoria

Central plant yard supporting mobilisation across South Sudan — cranes, forklifts, low beds and dump trucks moving plant between active sites.

  • Heavy plant mobilisation and low-bed transport
  • Crane and forklift services
  • Workshop maintenance and spare parts
  • Fleet dispatch and fuel logistics

Have a corridor, pad or structure to build?

Talk to our team